Details
✕ Close
LEGAL PARCEL AREA
1,058 m²
Lot 2 DP 14592
MDRS 1.0M ENVELOPE
899.5 m²
85.0% Net Buildable
3.0M PIPE BUFFER
28.0 m²
CCC Protected Zone
MAX SITE COVERAGE
529.0 m²
50% District Plan
VIEW MODE & SNAPPED LAYERS
📐 2D Plan
🏛️ 3D View
Boundary
MDRS Envelope
CCC 3-Waters
3.0m Setback
Tree RPZ (AS 4970)
Download Feasibility Scan (PDF)
LINZ Survey Cadastre • Direct CCC GIS Reticulation
4D EPOCH TIMELINE
Week 24
Week 1 (Base)
Week 2 (Current)
M3C2 Heatmap
TOTAL EXCAVATION (CUT)
-11,634 m³
TOTAL EMBANKMENT (FILL)
+3,135 m³
NET VOLUME MOVED
-8,499 m³
Download Sample QS Audit (PDF)
LINZ Cadastre · Sample Specimen Math
M3C2 Earthworks Heatmap
NZVD2016
Deep Basin Cut
> -1.0m (-2,140 m³)
Pad Bulk Cut
-0.3m to -1.0m
Subgrade Trim
-0.1m to -0.3m
Certified Subgrade
±0.04m (Passed)
Hardstand Fill
+0.1m to +0.9m
Stockpile SP-01
+2.8m Peak
6 RTK GCPs Verified
RMSE ±0.024m
Layer Title
LINZ/CCC
👆 Click to inspect asset
EPSG:2193